{"id":101524,"date":"2023-11-08T17:42:17","date_gmt":"2023-11-08T21:42:17","guid":{"rendered":"https:\/\/nowgrenada.com\/?p=101524"},"modified":"2023-11-13T13:42:26","modified_gmt":"2023-11-13T17:42:26","slug":"eoi-refurbishment-and-upgrade-of-rainwater-harvesting-systems-and-cistern","status":"publish","type":"post","link":"https:\/\/nowgrenada.com\/2023\/11\/eoi-refurbishment-and-upgrade-of-rainwater-harvesting-systems-and-cistern\/","title":{"rendered":"EOI: Refurbishment and upgrade of rainwater harvesting systems and cistern \u00a0"},"content":{"rendered":"

The National Water and Sewerage Authority (Nawasa) has commenced the implementation of projects under Component <\/strong>3 of the <\/strong>Grenada Climate Resilient Water Sector <\/strong>(G-CREWS) Project which is funded by Green Climate Fund (GCF) through a local branch of the German Development Agency Deutsche Gesellschaft f\u00fcr Internationale Zusammenarbeit (GIZ) GmbH. <\/strong><\/p>\n

This project supports the integration of climate resilience into Grenada\u2019s water sector by improving Nawasa\u2019s water storage capacity. This will ensure sound and climate-responsive regulation of water resource management and will eventually lead to a strengthened institutional and regulatory system for climate-responsive planning and development.<\/p>\n

This proposal request intends to hire a qualified firm to submit Expressions of Interest to execute a feasibility study, prepare preliminary and detailed design and bidding documents, and support the tendering procedures as well as site supervision services for refurbishment and upgrade of the rainwater harvesting system and cisterns. The main responsibilities of the consultancy are:<\/p>\n

    \n
  1. Collect all data required for the feasibility study and preliminary and detailed design documents. Review existing documentation, studies, and assessments from Nawasa under the G-CREWS project<\/li>\n
  2. Produce and submit findings of project feasibility study. Include at least 2 options for each project site<\/li>\n
  3. Produce and submit project preliminary and detailed designs, including drawings, cost estimates, methodology, and schedules<\/li>\n
  4. Prepare and support Nawasa with bidding documents, tendering process, and bid evaluation<\/li>\n
  5. Provide supervision services for the construction works to be implemented<\/li>\n
  6. Provide capacity-building instructional training for the maintenance of the implemented infrastructure<\/li>\n<\/ol>\n

    Scope of the work<\/strong><\/p>\n

    Provide preliminary and detailed designs, prepare bid documents, support tendering procedures and evaluation of bids, and site supervision services for retrofitting 3 facilities, shown as follows:<\/p>\n

    Carriacou: <\/strong><\/p>\n

      \n
    1. Dover Cistern (Government School)\n